{"id":38,"date":"2018-11-27T07:45:52","date_gmt":"2018-11-27T07:45:52","guid":{"rendered":"http:\/\/www.plantg.co.jp\/?page_id=38"},"modified":"2024-02-22T23:53:42","modified_gmt":"2024-02-22T14:53:42","slug":"double","status":"publish","type":"page","link":"http:\/\/plantg.co.jp\/en\/products\/flyash\/double\/","title":{"rendered":"DOUBLE-TUBE CONVEYING"},"content":{"rendered":"<div class=\"flexbox_2c\">\n<section class=\"leftside\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-269\" src=\"http:\/\/www.plantg.co.jp\/wp-content\/uploads\/2018\/12\/double2.jpg\" alt=\"\uff12\u91cd\u7ba1\" width=\"500\" height=\"370\" srcset=\"http:\/\/plantg.co.jp\/en\/wp-content\/uploads\/sites\/2\/2018\/12\/double2.jpg 500w, http:\/\/plantg.co.jp\/en\/wp-content\/uploads\/sites\/2\/2018\/12\/double2-300x222.jpg 300w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p class=\"piccap\">double-tube<\/p>\n<\/section>\n<section class=\"rightside\">\n<h5 class=\"machbnr\">Outline<\/h5>\n<div id=\"mactext\">\n<p>The inner-tube to pour compressed air separately in the pipage is installed.<\/p>\n<p>This structure in which a pipe was installed is the feature and a large number of advantages are offered to double-tube conveying systems by this structure.<\/p>\n<\/div>\n<h5 class=\"machbnr\">\u7279\u3000\u5fb4<\/h5>\n<div id=\"mactext\">\n<p>\n\u25cf The wear life of the transport pipes, which are subject to abrasion, is long. In the case of fly ash conveying, using STPG pipes has shown wear to be less than 0.1mm per year, functioning without issues for over 30 years, making the use of abrasion-resistant steel unnecessary.<br \/>\n\u25cf initial cost and running cost are inexpensive.<br \/>\n\u25cf The aerial amount of consumption is little and efficient.<br \/>\n\u25cf Even if the system is stopped with powder remaining inside the double-pipe line, it can be restarted as is without the need for line cleaning or similar maintenance.<br \/>\n\u25cf This system is controlled independently.<br \/>\n  Stable running is always made of that.<br \/>\n\u25cf For fly ash, there is a proven track record of successful long-distance transportation over 1000 meters.<\/p>\n<\/div>\n<\/section>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>double-tube Outline The inner-tube to pour compressed air separately in the pipage is installed. This structur&#8230;<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":35,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"tags":[],"_links":{"self":[{"href":"http:\/\/plantg.co.jp\/en\/wp-json\/wp\/v2\/pages\/38"}],"collection":[{"href":"http:\/\/plantg.co.jp\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"http:\/\/plantg.co.jp\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"http:\/\/plantg.co.jp\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/plantg.co.jp\/en\/wp-json\/wp\/v2\/comments?post=38"}],"version-history":[{"count":5,"href":"http:\/\/plantg.co.jp\/en\/wp-json\/wp\/v2\/pages\/38\/revisions"}],"predecessor-version":[{"id":920,"href":"http:\/\/plantg.co.jp\/en\/wp-json\/wp\/v2\/pages\/38\/revisions\/920"}],"up":[{"embeddable":true,"href":"http:\/\/plantg.co.jp\/en\/wp-json\/wp\/v2\/pages\/35"}],"wp:attachment":[{"href":"http:\/\/plantg.co.jp\/en\/wp-json\/wp\/v2\/media?parent=38"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/plantg.co.jp\/en\/wp-json\/wp\/v2\/tags?post=38"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}